NVO Transport truck at the loading docks of the distribution centre: cooperative EV transition of 54 logistics companies

E-mobility transition & EV · Cooperative · February 2026

NVO Transport: EV transition for 54 companies.

NVO Transport, a cooperative of 54 haulage companies, is moving to electric transport. Energyc supports the whole programme, from phase-in strategy and energy system to subsidies, market approach and positioning.

54Companies in a cooperative
AanZETAwarded
In progressDelivery
The brief

NVO Transport, a cooperative of 54 haulage companies, has to move to electric transport because of the 2030 zero-emission zones and rising diesel prices. Having each of the 54 companies work out how on its own is expensive and unwieldy, so the cooperative wanted one integrated programme covering strategy, subsidy and a central charging hub.

Energyc's role

A cooperative phase-in strategy for each member based on trip profiles, fleet age and depreciation schedules, design of the central charging hub and the cooperative AanZET application. We also supported the choice of the first electric trucks, the financing (EIA, MIA) and the user agreements. No member had to run its own tender.

Result

AanZET subsidy of €620,000 awarded for the charging hub with 12 DC chargers of 350 kW each; construction starts in Q3 2026, with the hub operational in Q1 2027. 18 members can electrify before 2027, and 7 members have ordered the first 11 electric trucks, for delivery in Q2 2027.

The challenge

54 companies, one cooperative, one programme.

NVO Transport is a cooperative of 54 Dutch haulage companies, ranging from owner-drivers with one tractor unit to fleets of 30+ trucks. The cooperative model: members share administration, procurement and strategy, but run their businesses independently.

With zero-emission zones announced for 2030 and diesel prices rising, the cooperative knew that the EV transition was no longer a future plan. It was an operational necessity. But having 54 companies each work it out on their own is expensive and unwieldy.

The cooperative brought in Energyc for an integrated programme, from strategy and subsidy to delivery of a central charging hub.

Our approach

Phase-in strategy + subsidy + charging hub design.

Energyc first drew up a cooperative phase-in strategy. For each member we looked at trip profiles, fleet ages and depreciation schedules. The conclusion: 18 members could sensibly electrify before 2027 (shorter trips, newer fleets), 22 members in 2027–2029 and 14 members only after 2029.

For the 18 early adopters we designed a central charging hub at NVO Transport's main site: 12 DC chargers of 350 kW each, available to all members through a shared booking app. NVO Transport made a collective AanZET application for the whole programme, and the subsidy was awarded.

For the members themselves, we supported the choice of their first electric trucks, the financing (EIA, MIA) and the user agreements with the charging hub. No member had to run its own tender for charging infrastructure or installers.

For 54 individual companies this was impossible. For a cooperative it's strategy. That's the difference, and that's where the value is. NVO Transport · Management
The result

Cooperative roll-out under way, model ready to scale.

AanZET subsidy of €620,000 awarded for the central charging hub. Construction starts in Q3 2026, with the hub operational in Q1 2027. The first 11 electric trucks have been ordered by 7 members, with delivery planned in Q2 2027.

For the cooperative as a whole this is an important step in positioning itself with clients that set zero-emission requirements. NVO members can now state in their quotations that they collectively have electric transport available, a valuable credential in tenders.

Highlights

What this project delivered.

  • ✓Cooperative phase-in strategy for 54 companies
  • ✓Central charging hub in design (12 DC chargers of 350 kW each)
  • ✓AanZET subsidy of €620,000 awarded
  • ✓11 electric trucks ordered by 7 members
  • ✓Cooperative user agreements + booking system
  • ✓Operational Q1 2027; members are already positioning themselves for zero-emission tenders

Figures from Energyc's project evaluation; measurement period and scope defined per project.