Practical guide, updated October 2026

AanZET subsidy applications: electric trucks in 2026

Status as at 16 October 2026: according to RVO (Netherlands Enterprise Agency), the round 2 budget was oversubscribed by more than €14 million on Thursday 1 October. Applications made on 1 October went to a ballot; those made from 2 October onwards are being rejected. Round 2 of AanZET, the purchase subsidy for zero-emission trucks, opened on Tuesday 29 September 2026 at 09:00. There was €119.2 million available; the subsidy goes up to 29% of the purchase price, with a maximum of €115,200 per truck. The window formally closed on Friday 16 October 2026 at 12:00. This page sets out the amounts per vehicle category, the conditions, the steps and why you should factor in charging infrastructure and grid capacity from day one.

What is the AanZET subsidy?

AanZET (Aanschafsubsidieregeling Zero-Emissie Trucks, the purchase subsidy scheme for zero-emission trucks) is an RVO subsidy for buying new, fully emission-free trucks, battery-electric or hydrogen, in categories N2 from 10,000 kg and N3. Round 2 of 2026 (09:00 on 29 September to 12:00 on 16 October, budget €119.2 million) was oversubscribed on 1 October. The subsidy is 6.1% to 29% of the purchase price, depending on vehicle category and company size.

Amounts per category

How much subsidy per electric truck?

AanZET is for companies and non-profit institutions (not government bodies). Only new, fully emission-free trucks qualify: vehicle category N2 from 10,000 kg or N3. The subsidy percentage depends on two things: the vehicle category and your company size under the EU SME definition. Small companies receive the most, large companies the least.

Vehicle category Small company & non-profit Medium-sized company Large company
N2 rigid truck
From 10,000 kg
14.8% (max €36,900) 12% (max €29,900) 6.1% (max €15,200)
N3 rigid truck & tractor unit
Heavy transport
29% (max €115,200) 21% (max €83,200) 11.1% (max €43,900)

Maximum amounts per truck, 29 September - 16 October 2026 round. The current percentages and conditions are on RVO's AanZET page. Separate routes apply to the charging hub and grid connection; see our subsidy overview.

Step by step

How to apply for AanZET in five steps

How round 2 worked: RVO processed each day's applications in order of receipt, and a ballot decided if the budget was oversubscribed. The time of day did not matter; the date did. Applicants who submitted a complete application on 29 September had the best chance, because the budget was already oversubscribed on 1 October. If you want to prepare for any future round, start weeks in advance, with the dealer's quotation and with your grid connection.

01

Check whether you qualify

New, fully emission-free truck (battery-electric or hydrogen), category N2 from 10,000 kg or N3. The applicant is a company or non-profit institution. Also determine your company size under the EU SME definition, which sets the percentage.

02

Sign a conditional purchase agreement

You need a purchase or finance lease agreement that is not yet final at the time of application. Include a conditional clause: "order becomes final once the AanZET application is granted".

03

Model charging infrastructure and grid capacity

An electric truck without charging capacity stands idle. Before ordering, check whether your connection can handle the charging load and what the grid operator's lead time is. If the grid is congested, you have options: smart charging, a battery or a flexible contract. See our guide to solving grid congestion.

04

Submit as soon as a window opens

In round 2 (from 29 September, 09:00) you could include at most 2 trucks per application on 29 and 30 September and at most 10 from 1 October, with one application per company per working day. RVO processed each day's applications in order of receipt and held a ballot if the budget was oversubscribed.

05

Finalise the purchase

After the grant decision, you finalise the order with the dealer within one month. From first registration, the truck must then stay registered in your name in the RDW register for 4 years without interruption.

Pitfalls

Five common mistakes in AanZET applications

1. Finalising the purchase before applying

The toughest condition in the scheme: the purchase or lease agreement must not yet be final when you submit. If you have already placed a binding order, you do not qualify. Agree a conditional clause with the dealer before you sign.

2. Not being ready on the first day

The Ministry of Infrastructure and Water Management (IenW) expected the €119.2 million budget to cover about 1,700 trucks, and by 1 October, the third day of the window, it was already oversubscribed. Each day's applications were processed in order, and a ballot was held if the budget was oversubscribed. In round 2, if you had not submitted a complete application on 29 or 30 September, you ended up in the ballot or missed out on funding altogether.

3. Looking only at the truck

AanZET covers the truck, not the charging hub and not the grid connection. If you only discover after ordering that the grid operator is quoting years of lead time, you have a subsidised truck with no electricity. At Raben Group, an ANW contract solved this: capacity within 6 months instead of a wait of 5+ years.

4. Stacking subsidies incorrectly

Any other government subsidy for the same truck is deducted from AanZET; the Energy Investment Allowance (EIA) is exempt. Separate routes apply to charging infrastructure and batteries. A well-designed subsidy stack delivers more than applying for each scheme separately.

5. Misjudging your company size

On an N3 tractor unit, the difference between a small and a large company is 29% versus 11.1%: tens of thousands of euros per vehicle. The EU SME definition also counts parent and sister companies. Check this beforehand, not at final settlement.

Why Energyc

Truck, charging hub and grid capacity as one business case

A subsidy advisor handles the application. An installer builds the charging hub. The grid operator controls the connection. Energyc models all three as one business case, because an electric truck only runs if subsidy, charging capacity and grid capacity come together on time. We are independent and never work on commission from dealers, installers or energy companies.

You can see what that delivers in practice. For NVO Transport, a cooperative of 54 transport companies, we secured €620,000 in AanZET subsidy and designed a central charging hub with 12 DC chargers rated at 350 kW; the first 11 electric trucks have been ordered. At Raben Group we combined a 400 kW DC charging hub with a 200 kWh battery and an ANW contract: capacity within 6 months, where a standard connection upgrade would take 5+ years. Read more about our approach on the e-mobility transition and solving grid congestion pages. For charging hubs running into grid congestion, the Flex-e scheme covered part of the advisory costs in 2026 (the window closed on 15 October 2026).

Frequently asked questions

Questions about the AanZET subsidy.

How much subsidy do I get per electric truck in 2026?

That depends on vehicle category and company size. For an N3 rigid truck or tractor unit, a small company or non-profit receives 29% of the purchase price (at most €115,200 per truck), a medium-sized company 21% (at most €83,200) and a large company 11.1% (at most €43,900). For an N2 rigid truck from 10,000 kg, the percentages are 14.8%, 12% and 6.1%.

When can I apply for the AanZET subsidy?

Round 2 of 2026 ran from 09:00 on Tuesday 29 September 2026 until 12:00 on Friday 16 October 2026, or for as long as the €119.2 million budget lasted. That budget was oversubscribed on 1 October; RVO (Netherlands Enterprise Agency) rejects applications made from 2 October onwards. On 29 and 30 September you could include at most 2 trucks per application, and from 1 October at most 10. One application per company per working day was allowed; RVO processed each day's applications in order of receipt and held a ballot if the budget was oversubscribed. For any future round, keep an eye on RVO's AanZET page.

Can I buy the truck before applying?

You need a purchase or finance lease agreement, but it must not yet be final when you apply. Include a conditional clause, for example: "order becomes final once the AanZET application is granted". After the grant decision, you finalise the purchase within one month. If the purchase is already final, there is no subsidy.

Does AanZET also cover charging infrastructure?

No. AanZET only covers part of the purchase of the new, fully emission-free truck itself. For charge points and a stationary battery on your own site there is SPRILA, with fixed amounts per charging station and an application window that is open until 18 December 2026 inclusive. There is also the EIA for business assets on the Energy List (Energielijst) and the Flex-e scheme for advisory costs where the grid is congested (2026 window closed on 15 October). That is exactly why it pays to model the truck, the charging hub and grid capacity as one business case.

Can I combine AanZET with other subsidies?

Partly. If another government body already subsidises the same truck, RVO deducts that amount from the AanZET subsidy; the Energy Investment Allowance (EIA) is exempt from this. The truck must also remain registered in your name in the RDW register (the Dutch vehicle register) for 4 years without interruption from first registration.

Sources & references

Sources

  • RVO — AanZET-regeling · application period, budget and subsidy amounts per category (29 September - 16 October 2026 round)
  • RVO — AanZET-voorwaarden · vehicle requirements, purchase agreement, vehicle registration and combination with other subsidies
  • RVO — Flex-e-regeling · advisory costs where the grid is congested, applications 6 May to 15 October 2026 inclusive
  • Netbeheer Nederland · publications on grid congestion and connection procedures