E-mobility transition. From first charge point to integrated EV strategy.
The switch to zero-emission transport touches every part of your business: engineering, finance, planning, staff. We support you through the whole transition, from charging infrastructure design to fleet electrification.
- Your trucks or vans can't charge at the depot.
- In the run-up to 2030, your diesel vehicles lose access to the zero-emission zone.
- Charging hub designed, but Liander or Enexis has no grid capacity.
Even then there are usually options: smart charging within your current connection, adding a battery or your own solar, or an ANW contract to connect sooner. Read about the options, how they have worked in practice and who you would speak to.
Our services
Five practical approaches.
There is no standard solution. We choose the combination that delivers most in each situation.
EV fleet plan
Analysis of your fleet, charging profiles and realistic phase-in scenarios. What to buy and when, and how to provide charging infrastructure that scales with it.
Guide: electric trucks with too little grid capacity →Charging hub design
From AC to 400 kW DC. Site analysis, capacity plan, grid connection strategy, civil works support. We work with your installer or run a tender.
Guide: upgrading a connection →Smart charging
Charging managed around surplus PV, low-tariff hours and peak limits. We specify the OCPP requirements and link them to your energy profile.
Financing & subsidies
AanZET, MIA/Vamil, EIA and regional schemes. Lease or buy, third-party financing. We build the business model.
Guide: SPRILA subsidy →PV integration
Making the most of your own solar. We size panels, batteries and charging infrastructure as one system. This is all the more urgent now that net metering ends in 2027.
Guide: solar panels without feed-in →What is the e-mobility transition?
The e-mobility transition is the shift from fossil-fuelled to zero-emission vehicles for logistics fleets, company fleets and public transport. The technology works; the bottlenecks are charging infrastructure design, grid connection, financing and planning. Since 1 January 2025, zero-emission zones have barred new diesel vans. Existing vans follow under the transition scheme, Euro 5 from 2027 and Euro 6 from 2028.
The problem
Irreversible, and more complex than it looks.
From 2027, new fossil-fuel company lease cars face a heavy tax burden through a pseudo final levy (pseudo-eindheffing). And since 1 January 2025, zero-emission zones in almost twenty city centres have barred new diesel vans.
Companies that switch now come out ahead on payback period and secure their vehicle supply from manufacturers.
We turn your vehicle movements into a charging hub design that fits, link it to surplus PV or a battery, and arrange the subsidies (AanZET for the truck, SPRILA for the charge points and the battery, EIA) that make it pay.
Is your depot's grid connection too small for electric trucks? Read our guide on electric trucks with too little grid capacity.
Case study
BAT Tilburg: the largest DC charging hub in the Netherlands.
From first design to EU procurement and delivery. Energyc supported BAT through full fleet electrification and secured the AanZET subsidy.
Technology is no longer the question in the EV transition. Planning, financing and grid infrastructure are, and that is where we work. Energyc · Our approach to mobility
How long does a project like this take?
Scoping and plan: 6–10 weeks. Charging hub design and tender: 3–6 months. Construction: 6–12 months, depending on permits and the grid operator.
Will that get us a grid connection?
That depends on the local grid situation. Charging infrastructure for your own vehicles does not fall under the priority categories of the prioritisation framework; charging infrastructure for public transport does, as a basic need. With smart charging, a battery and PV you can sometimes stay within your existing capacity, and an ANW contract or time-block transport (blokstroom) can be a route to connecting sooner.
What does a charging hub design cost?
From €8,500 for a small charging hub (5–10 charge points); €25,000 to €60,000 for a large DC charging hub, including tender support. Nearly always recouped through subsidy and savings.
Answers to your first questions.
What does a charging hub design from Energyc cost?
A charging hub design starts from €8,500 for a small hub (5–10 charge points). For a large DC charging hub, including tender support, the cost is between €25,000 and €60,000. The Flex-e application window run by RVO (the Netherlands Enterprise Agency), which offered a 50% subsidy towards a flexibility scan or feasibility study where grid congestion is a problem, closed on 15 October 2026; see our Flex-e guide for more. Energyc is FedEC-accredited.
How long does it take to build charging infrastructure?
Allow 6–10 weeks for scoping and the fleet plan, and 3–6 months for designing and tendering the charging hub. Construction then takes 6–12 months, depending on permits and the grid operator's lead time. Altogether, a complete charging hub is usually in place within one to two years.
What do zero-emission zones mean for my fleet?
Since 1 January 2025, zero-emission zones in almost twenty city centres have barred new diesel vans, and that number will keep growing up to 2030. Existing diesel vans fall under a national transition scheme: Euro 5 until 1 January 2027, Euro 6 until 1 January 2028. Trucks may continue until 2030 at the latest, depending on type. In addition, from 2027 employers pay a pseudo final levy (pseudo-eindheffing) on new fossil-fuel lease cars available for private use. If you deliver or work in those city centres, planned electrification is no longer optional. An EV fleet plan sets out what you replace and when.
Do I need a bigger grid connection for charging infrastructure?
Not necessarily. With smart charging (managed around surplus PV, low-tariff hours and peak limits), and if needed a battery, you can often stay within your existing connection capacity. If you do need more capacity, an ANW contract or time-block transport (blokstroom) can be a route to connecting sooner. The priority given under the prioritisation framework applies to charging infrastructure for public transport, not to charging infrastructure for your own vehicles.
What subsidies are there for electric trucks and charging infrastructure?
The AanZET scheme covers the purchase of zero-emission trucks; for investments in charging infrastructure and batteries, EIA and MIA/Vamil offer attractive tax benefits, supplemented by regional schemes. For charging infrastructure itself there is the SPRILA subsidy. The Flex-e application window run by RVO (the Netherlands Enterprise Agency), which offered a 50% subsidy towards a flexibility scan or feasibility study where grid congestion is a problem, closed on 15 October 2026; see our Flex-e guide for more. On BAT Tilburg we secured the AanZET subsidy as part of the project.
Schedule an exploratory call about your fleet.
You share your vehicle movements and schedule; we come back with a first sketch of the charging infrastructure, financing routes and the subsidies currently open.
Discuss your situation →