Practical guide, September 2026

EED audit obligation 2027: what your company must do, and when

Three obligations affect the same companies in 2027. The revised European directive requires enterprises with an average annual consumption of more than 85 TJ to have a certified energy management system by 11 October 2027 at the latest; that date does not apply to the energy audit. The same directive places the audit obligation on enterprises above 10 TJ that do not implement an energy management system. As of 22 September 2026 Dutch law still contains the old criterion (audit obligation for large enterprises); the draft decree still leaves open the submission deadline for companies newly subject to the audit obligation. Alongside this, the energy-saving obligation applies per site: on 1 July 2027 the payback period rises to 7 years, and 1 December 2027 is the next reporting date for the information obligation. According to the official estimate, an energy audit costs €2,000 to €30,000.

Does my company need an energy audit in 2027, and when?

That depends on your consumption and on which rules apply at the time. The revised European Energy Efficiency Directive (Art. 11) places the audit obligation on enterprises with an average annual consumption of more than 10 TJ over the previous three years, all energy carriers combined, that do not implement an energy management system. Above 85 TJ the directive requires a certified energy management system by 11 October 2027 at the latest; that date applies only to the system, not to the audit. As of 22 September 2026 Dutch law has not yet been amended: the bill is before the Senate (Eerste Kamer) and Article 18 of the current act still places the audit obligation on large enterprises. The draft decree leaves the submission date for companies newly subject to the audit obligation open; RVO (Netherlands Enterprise Agency) refers to one year after the Dutch regulations take effect. According to the official estimate, an energy audit costs €2,000 to €30,000; for newly covered SMEs, around €4,500.

Two regimes, two reporting channels

The audit and energy-saving obligations are separate

The EED audit obligation and the energy-saving obligation are often confused in practice. That is understandable: both are about companies saving energy. Legally they have little to do with each other. The audit obligation applies per enterprise and is measured in terajoules; the energy-saving obligation applies per site and is measured in kWh and m³ of natural gas equivalent. A company can fall under both, under one of them, or under neither.

As of 22 September 2026, two texts coexist for the audit obligation. The revised directive and the Dutch draft decree work in terajoules; current Dutch law still uses the definition "large enterprise". The table shows both.

EED audit obligationEnergy-saving obligation
Legal basisWet uitvoering EU-handelingen energie-efficiëntie (the Dutch act implementing EU energy efficiency rules), Art. 18. As of 22 September 2026 the revised Directive (EU) 2023/1791, Art. 11, has not yet been transposed into that actEnvironment and Planning Act (Omgevingswet): Besluit activiteiten leefomgeving (Bal), Art. 5.15 (activities) and Besluit bouwwerken leefomgeving (Bbl), Art. 3.84 (buildings)
Applies perEnterprise, including linked enterprisesSite (environmentally harmful activity)
ThresholdCurrent law: large enterprises (non-SMEs under the old directive). Revised directive and draft decree: more than 10 TJ (audit, for those not implementing an energy management system) or more than 85 TJ (energy management system), average annual consumption over the previous three years, all energy carriers combined50,000 kWh of electricity or 25,000 m³ of natural gas equivalent a year; above 10,000,000 kWh or 170,000 m³ the stricter investigation obligation (onderzoeksplicht) applies
What you must doSubmit an energy audit, or operate a certified energy management system. A report you submit after the new rules take effect must include an action plan (RVO)Carry out all measures with a payback period of up to five years (seven years from 1 July 2027, as announced) and report on them
Report toRVO, on behalf of the ministerRegional environment agency (omgevingsdienst, the competent authority)
FrequencyEnergy audit: at least once every four years, both in current law (Art. 18) and in the directive (Art. 11(2))Once every four years; next deadline 1 December 2027
EnforcementOrder subject to a penalty payment (last onder dwangsom) by the minister (RVO)Order subject to a penalty payment or administrative enforcement (bestuursdwang) by the municipality or regional environment agency

Status: the TJ thresholds come from the directive and the consultation version of the amending decree (December 2025); until the Dutch implementation act takes effect, Article 18 applies in its current form. The law words the lower limit of the energy-saving obligation as an exception: the obligation does not apply if energy use in any calendar year is below 50,000 kWh of electricity and 25,000 m³ of natural gas equivalent (Bal, Art. 5.15(3)). If you exceed either one, you are covered. Sources: Directive (EU) 2023/1791 Art. 11; Wet uitvoering EU-handelingen energie-efficiëntie Art. 18; Bal Art. 5.15 to 5.15b; RVO and IPLO (the government's information point on environmental law), accessed 22 September 2026.

The two regimes do overlap in substance. Earlier audit rounds show that the bulk of the measures listed have a payback period of five years or less (explanatory note to the EED amending decree, §4.1). Where a site falls under the energy-saving obligation, measures with a payback period of up to five years that meet the conditions of Article 5.15 Bal must already be carried out there. The EED audit itself has no fixed payback limit: RVO considers it plausible that "cost-effective" in the audit is not tied to five years.

Three deadlines in 2027

11 October 2027 applies only to the energy management system

If you read 11 October 2027 as "the EED deadline", you miss a distinction. Article 11(1) of the directive gives that date for the energy management system obligation: enterprises above 85 TJ must have an energy management system in place by then. For the energy audit above 10 TJ the directive gives a different date: a first audit by 11 October 2026 at the latest, then at least once every four years (Art. 11(2)).

If you check the Dutch text of the directive, you will not find the 2027 obligation there. In Article 11(1), second subparagraph, the verb is missing; the sentence ends at "uiterlijk op 11 oktober 2027" (by 11 October 2027). The English text is complete: enterprises must have an energy management system "in place" by that date. If in doubt, use the English version.

For sites covered by the energy-saving obligation, two more dates apply in 2027. Together that makes three deadlines that are legally separate but affect the same companies.

DateWhat changesWho it applies toLegal basis
1 July 2027Payback period for the energy-saving obligation rises from 5 to 7 years. Updated Recognised Measures List; sectors move from investigation to information obligationSites using at least 50,000 kWh or 25,000 m³ of natural gas equivalentBal/Bbl amendment announced by IPLO; according to IPLO, publication will follow in early 2027
11 October 2027Energy management system implemented and certified. Evidence plus list of cost-effective measures submitted to RVOEnterprises with an average annual consumption of more than 85 TJDirective (EU) 2023/1791 Art. 11(1); RVO
1 December 2027Final submission date for the information and investigation obligations. Transitional provisions from the Activities Decree (Activiteitenbesluit) lapseSites that had an information or investigation obligation on 1 December 2023Bal Art. 5.15a, 5.15b and 5.15d; RVO

Sources: IPLO, Ontwikkelingen Energiebesparingsplicht 2027; RVO, Herziene EED-auditplicht; RVO, Informatieplicht energiebesparing; all accessed 22 September 2026.

The audit deadline is missing from this table, and that is not a mistake. The Netherlands has not yet set that date. We explain why two sections further on.

Thresholds

Who is covered by the audit obligation: over 10 TJ, over 85 TJ

The revised directive links the audit obligation to energy use, no longer to company size. Turnover and headcount no longer matter (explanatory note to the EED amending decree, §2.1.1). The measure is average annual energy consumption over the previous three years, with all energy carriers added together. The unit is the terajoule.

There are two thresholds. Above 10 TJ the audit obligation applies to enterprises that do not implement an energy management system. Above 85 TJ an energy management system is mandatory (Directive (EU) 2023/1791, Art. 11(1) and (2)). Note the wording: the directive says "more than 10 TJ". On the same page RVO writes both "10 TJ or more" and "more than 10 TJ". For an enterprise exactly on the threshold, that decides whether the obligation applies at all; the directive text is the source here.

What counts? The energy use of all sites and activities within the enterprise, including linked enterprises. Companies are linked through a majority interest or a majority of the voting rights (RVO). Three boundaries matter here:

  • Franchisees do not count towards the parent company. An individual franchise business is subject to the audit obligation only if it exceeds the limit on its own (RVO).
  • Only Dutch sites count. The energy use of sites outside the Netherlands is excluded from the calculation (explanatory note, §2.1.1).
  • Public bodies are covered to the extent that they carry out an economic activity on a market, such as a municipal waste processing company competing with a private enterprise (explanatory note, §2.1.1).

The change shifts who is covered. According to the regulatory burden section, about 550 enterprises become newly subject to the audit obligation and about 650 drop out. About 1,040 enterprises become subject to the energy management system obligation; roughly 100 of them already have such a system (explanatory note, §4.1). So if your SME was never subject to the audit obligation but uses a lot of energy, this change brings you in.

State of the legislation

The Netherlands is late. What should you rely on now?

Member states had to transpose Article 11 by 11 October 2025 (Directive (EU) 2023/1791, Art. 36). As of 22 September 2026 the Netherlands has not done so. The implementation bill (file 36.868) was submitted on 9 December 2025, passed by the House of Representatives (Tweede Kamer) on 30 June 2026 and is before the Senate (Eerste Kamer). The committee reported on 16 September 2026 and is awaiting the government's response. The act and the amending decree take effect "at a time to be determined by royal decree"; RVO expects this "from the end of 2026".

Until then the old law applies. Article 18 of the Wet uitvoering EU-handelingen energie-efficiëntie still places the four-yearly audit on "large enterprises", defined through the SME definition of the old directive. So today an SME above 10 TJ is not yet formally subject to the audit obligation; a large enterprise below that limit is. That remains the case until the new act takes effect.

As a result, there are three parallel positions on the audit deadline:

SourceFirst energy audit (more than 10 TJ)Energy management system (more than 85 TJ)
Directive (EU) 2023/1791By 11 October 2026 at the latest, then at least once every four yearsBy 11 October 2027 at the latest
RVONewly covered: up to one year after the Dutch regulations take effect. Already covered: within four years of the previous audit; a report you submit after entry into force must meet the new requirements and include an action planSubmit evidence by 11 October 2027 at the latest, with a list of cost-effective measures
Draft decree (consultation Dec. 2025)Submission date still shown as "PM" (to be determined); will be "about a year after entry into force"Before 11 October 2027 for those that exceeded the limit before entry into force; as a standing rule, within two years of exceeding it

Sources: Directive (EU) 2023/1791 Art. 11 and 36; RVO, Herziene EED-auditplicht; Internetconsultatie wijzigingsbesluit EED and explanatory note §2.1.2; Eerste Kamer, dossier 36.868; all accessed 22 September 2026.

These three positions coexist; as of 22 September 2026 the Dutch submission deadline for enterprises newly subject to the audit obligation has not been fixed. The sources consulted do not say whether the Netherlands will enforce the directive's date of 11 October 2026 for the first audit. RVO does not mention that date on its page about the revised audit obligation and refers to one year after entry into force; for enterprises already subject to it, RVO gives a period of four years after the previous audit. Those sources do not spell out what an enterprise can expect if the Dutch rules only take effect after the directive's date.

What does this mean in practice? That depends on your position.

  • You are already subject to the audit obligation as a large enterprise. Your four-year period simply continues. If you submit your next report after the new act takes effect, the new requirements apply and an action plan must be included (RVO).
  • You are newly covered by the audit obligation (more than 10 TJ, not a large enterprise). There is no Dutch obligation today. According to RVO you get one year after entry into force. Collect your consumption data for the past three years now, so you do not need that year just to get started.
  • You are above 85 TJ. The directive gives 11 October 2027; RVO confirms that date for submitting evidence, and the draft decree uses it for enterprises that exceeded the limit before entry into force (explanatory note, §2.1.2). The note of December 2025 mentions 17 accredited certification bodies and warns that their capacity may become a bottleneck if you start late (§4.1). The clock runs towards that date even while the Dutch act is delayed.

One caveat on everything above that comes from the amending decree: it is the consultation version of December 2025. The consultation ran until 25 January 2026 and drew 14 responses. The final text may differ.

Energy management system

Energy management system above 85 TJ: ISO 50001 is an example, not a requirement

The directive does not name ISO 50001 anywhere. It requires an energy management system "certified by an independent body in accordance with the relevant European or international standards" (Art. 11(1)). RVO gives ISO 50001 as an example of such a system. The directive does not prescribe which standard you choose; it does prescribe certification by an independent body.

The consultation version of the amending decree (December 2025) sets requirements that go beyond a certificate on the wall. The system must cover the entire enterprise, including linked enterprises, and relate to processes, buildings and transport. It must contain a strategic element: the evaluation of energy use is part of a continuous improvement process, usually updated annually and at least once every three years, with data monitored at least annually (explanatory note, §2.1.2). According to the same draft, the certification body must be accredited by a national accreditation body (§2.1.8).

The consultation version also contains transitional provisions for existing certificates. A certificate issued before entry into force by a non-accredited body stays valid until it has to be renewed; the note gives the example of a 2025 certificate that need not be replaced until 2029 (§4.1). An existing energy or environmental management system may continue until its next certification, provided it was in use before 11 October 2027 and the enterprise has supplied a copy by that date at the latest (§2.1.8). As of 22 September 2026 it is not known whether these provisions will reach the final decree unchanged.

Below 85 TJ an energy management system is not an obligation but an alternative to a separate audit. The directive subjects only enterprises "that do not implement an energy management system" to an audit. If you have the system for the whole enterprise, you submit the evidence and the list of cost-effective measures to RVO. Partial coverage is also allowed: if one site or subsidiary has a recognised system, no audit is needed there; you state this in the audit report and submit one report for the whole organisation (RVO).

The directive has two exemptions that apply to both the audit obligation and the energy management system obligation (Art. 11(1) and (2)). The first is an environmental management system certified by an independent body in accordance with European or international standards, provided it includes an energy audit based on the minimum criteria of Annex VI (Art. 11(11)). The second is an energy performance contract, provided the contract covers the necessary elements of the energy management system and meets the requirements of Annex XV (Art. 11(10)).

RVO also mentions a quality mark recognised by the Ministry of Climate Policy and Green Growth; it fulfils the audit obligation for the sites or activities it covers. An added benefit for sites with an investigation obligation: with ISO 50001, or ISO 14001 combined with ISO 14051, you meet the structural energy management component and the 14 related questions no longer apply (RVO, Onderzoeksplicht).

Costs

What does an energy audit cost? The official estimate

Official cost estimates are in the regulatory burden section of the amending decree (consultation version December 2025). We did not find any other official Dutch cost indications in a primary source. These figures are not quotes, but they are the yardstick the government itself uses.

ItemOfficial estimateNotes
Energy audit€2,000 to €30,000 per auditDepending on the complexity and size of the enterprise
Energy audit, newly covered SMEsAround €4,500The expectation is that this group sits "right at the bottom of the cost estimate"
Action plan with the auditAbout 20 extra hoursFor enterprises without an investigation obligation, calculated at €33 per hour
Introducing an energy management systemAverage of €59,000, one-offEstimate from the explanatory memorandum; the breakdown is not specified
Maintaining an energy management system400 to 800 hours a year, on average 600 hours at €33 = €19,800 a yearPlan-do-check-act cycle, internal hours

Source: explanatory note to the EED amending decree, §4.1 (consultation version December 2025), accessed 22 September 2026. The rate of €33 per hour is the regulatory burden rate for a technical employee from the Handboek Meting Regeldrukkosten (EZK, 2023), not a market price for external advice. The €59,000 is an estimate of the cost of introducing the system, not a certification fee.

According to the note, audit costs depend on the complexity and size of the enterprise. The audit covers the whole organisation: you submit one report, even if a site or subsidiary already has a recognised energy management system (RVO). Only for newly covered SMEs does the note state an expectation, around €4,500; it does not say where other enterprises fall within the range. When you ask for a quote, check which sites and energy carriers are included; a broader price comparison of advisory work is in the guide What does energy advice cost?

The Energy Investment Allowance (EIA) offers, under certain conditions, scope to include advisory costs in a qualifying investment. According to RVO, you then deduct 40% of the investment from taxable profit, with a minimum of €2,500 per notification and a notification period of 3 months after the investment commitment. Advisory costs count only if that advice leads you to invest in an asset that meets the EIA requirements; they do not count on their own. We found no source that treats a separate EED audit or an ISO 50001 programme as deductible in its own right.

In its letter to parliament (Kamerbrief) of 5 June 2024, the ministry announced an energy-saving desk for SMEs, partly because of the heavier burden of the seven-year period. According to that letter, InvestNL was looking into how best to set up the desk (parliamentary paper 30196, no. 830). We have not consulted a more recent progress report.

What data the audit asks for

The threshold test asks for average annual energy consumption over the previous three years, all energy carriers combined, for all Dutch sites and linked enterprises (Directive (EU) 2023/1791, Art. 11; RVO). The audit itself must result in an overview of the cost-effective energy-saving potential and, if submitted after the new rules take effect, an action plan (RVO). For the energy-saving information obligation you supply energy use per site in kWh and m³ of natural gas equivalent over a calendar year (Bal, Art. 5.15a). None of the sources consulted says how large a share of the audit work is data collection.

The consumption data the audit asks for can also be used for a flexibility scan and a grid congestion analysis, so you do not have to collect that data three times. Two examples from our work: for the Dutch football association KNVB we modelled the energy costs of 47+ football clubs across four energy flows up to 2030. For Metalis in Drachten we combined 450 solar panels, a 1.2 MWh battery and a capacity restriction contract (CBC-T) with Liander; CO2 emissions from natural gas (scope 1) went from 67 to 0 tonnes a year.

Enforcement

How binding is the obligation? It depends which one

For the EED audit obligation, the minister is responsible for supervision, and RVO carries it out (Wet uitvoering EU-handelingen energie-efficiëntie, Art. 23). The enforcement tool is an order subject to a penalty payment (last onder dwangsom). There is no administrative fine: the fine provision in this act covers other articles, with fines imposed by ACM (the Dutch regulator); it does not cover the audit obligation. After implementation, RVO will also check the energy management system obligation (explanatory note, §5.1). The directive adds a disclosure obligation: the action plan and the implementation rate of the recommendations must be published in the enterprise's annual report (Art. 11(2)).

The energy-saving obligation is enforced by the municipality or province, in practice the regional environment agency. It works under the Landelijke Handhavingsstrategie Omgevingsrecht (the national environmental enforcement strategy), in force since November 2022 (IPLO). The process has four steps: an order subject to a penalty payment once the warning period has expired, an inspection after the remedial period, collection of the penalty and, if the breach continues, a higher penalty or administrative enforcement (bestuursdwang). IPLO publishes guideline amounts from the enforcement actions guide (leidraad handhavingsacties):

BreachPenalty per instanceInstancesCompliance period
Simple measures (payback 1–2 years) not carried out€750 per week, at least the investment cost38 weeks
Medium measures (payback 3–4 years) not carried out€1,500 per month, at least the investment cost23 months
Complex measures (payback 5 years) not carried out€1,500 per month13 months
Not completed within agreed deadlines€750 per week24 weeks
Mandatory investigation not carried outCase-specific (10% of the energy bill)34 weeks

Source: IPLO, Toezicht en handhaving energiebesparingsplicht, stap 4: Handhaving, accessed 22 September 2026. Guideline amounts; the competent authority sets the amount case by case.

Two points from enforcement practice deserve attention. A penalty may be collected a maximum of 5 to 10 times, and at each collection the competent authority must establish afresh that the breach is continuing (IPLO). And reporting is not the same as complying: if you file your information obligation report on time and in full but do not carry out the measures, you do not meet the energy-saving obligation. A customised decision (maatwerk) can phase implementation, but cannot relax the obligation (Bal, Art. 5.16). We found nothing in the documents consulted on how many such orders RVO or the regional environment agencies have actually imposed.

Frequently asked questions

Questions about the audit obligation.

What does an energy audit cost?

According to the official estimate in the explanatory note (nota van toelichting) to the EED amending decree, an energy audit costs €2,000 to €30,000, depending on the complexity and size of the enterprise. For SMEs newly covered by the audit obligation, the government expects costs of around €4,500. For enterprises without an investigation obligation (onderzoeksplicht), the note estimates about 20 extra hours for the action plan that accompanies the audit. Introducing an energy management system such as ISO 50001 is estimated at €59,000 on average as a one-off cost, plus 400 to 800 hours of internal time a year. Source: explanatory note to the EED amending decree, §4.1, consultation version of December 2025.

What is the difference between the audit deadline and the 11 October 2027 deadline?

The date 11 October 2027 applies only to the energy management system obligation: enterprises with an average annual consumption of more than 85 TJ must have a certified energy management system in place by then (Directive (EU) 2023/1791, Art. 11(1)); RVO (Netherlands Enterprise Agency) confirms that date for submitting evidence. For the energy audit above 10 TJ the directive gives a different date: a first audit by 11 October 2026 at the latest. As of 22 September 2026 the Netherlands has not set that audit date in legislation; for enterprises newly subject to the audit obligation, RVO applies a period of one year after the Dutch regulations take effect, and the draft decree still shows the date as "PM" (to be determined). The sources consulted do not say whether the directive's audit date will be enforced in the Netherlands.

Is ISO 50001 mandatory?

Not as a specific standard. The directive requires enterprises with an average annual consumption of more than 85 TJ over the previous three years to have an energy management system certified by an independent body in accordance with European or international standards, by 11 October 2027 at the latest; it does not name ISO 50001, and RVO cites it as an example. Enterprises are exempt if they have a certified environmental management system that includes an energy audit under Annex VI, or an energy performance contract that covers the necessary elements of the energy management system and meets Annex XV (Art. 11(10) and (11)). Below 85 TJ an energy management system is not mandatory but a voluntary alternative to the energy audit: if you have a recognised system for the whole enterprise, that satisfies the audit obligation (RVO).

What is the difference between the EED audit obligation and the energy-saving obligation?

The EED audit obligation applies per enterprise, is reported to RVO and calls for an energy audit or an energy management system. Under the revised directive and the draft decree it applies above 10 TJ of average annual consumption over three years, to enterprises without an energy management system; under current Dutch law (Art. 18) it still applies to large enterprises until the implementation act takes effect. The energy-saving obligation applies per site, is measured in kWh and m³ of natural gas equivalent (threshold 50,000 kWh or 25,000 m³ a year), is reported to the regional environment agency (omgevingsdienst) and requires you to carry out all measures with a payback period of up to five years (announced to rise to seven years from 1 July 2027). A company can fall under both regimes at once.

At what energy consumption does the EED audit obligation apply?

Under the revised directive the audit obligation applies to enterprises with an average annual energy consumption of more than 10 TJ over the previous three years, all energy carriers combined, that do not implement an energy management system. Above 85 TJ an energy management system is mandatory. Turnover and headcount no longer matter. The consumption of all Dutch sites and linked enterprises counts; franchisees do not count towards the parent company. Note: until the Dutch implementation act takes effect, the old criterion formally still applies, under which only large enterprises are subject to the audit obligation.

What changes in the energy-saving obligation from 1 July 2027?

From 1 July 2027 the payback period within which measures are mandatory rises from 5 to 7 years. The lower limit of 50,000 kWh of electricity and 25,000 m³ of natural gas equivalent stays the same; the previously announced increase to 100,000 kWh will not go ahead. There will also be an updated Recognised Measures List (Erkende Maatregelenlijst), and several sectors move from the investigation obligation to the information obligation. In the investigation reports submitted, RVO identified 774 measures with a payback period of more than five and at most seven years, together worth about 8.2 PJ of energy savings a year. Source: IPLO and parliamentary paper (Kamerstuk) 30196, no. 830.

When do I have to report again under the energy-saving information obligation?

The information obligation (informatieplicht) applies once every four years. If you had an information obligation on 1 December 2023, you must report again to the regional environment agency by 1 December 2027 at the latest. On the same date the transitional provisions from the Activities Decree (Activiteitenbesluit) lapse. The same deadline applies to the investigation obligation (onderzoeksplicht), which is triggered when consumption exceeds 10,000,000 kWh of electricity or 170,000 m³ of natural gas equivalent in any calendar year. Source: Besluit activiteiten leefomgeving Art. 5.15a and 5.15b; RVO, Informatieplicht energiebesparing.

What happens if I do not submit the energy audit?

For the EED audit obligation, the minister is responsible for supervision, carried out by RVO. The enforcement tool is an order subject to a penalty payment (last onder dwangsom); there is no administrative fine (Wet uitvoering EU-handelingen energie-efficiëntie, Art. 23). Once the revised directive is implemented, RVO will also check the energy management system obligation. The energy-saving obligation is enforced separately by the regional environment agency. IPLO gives guideline amounts per category of breach: €750 per week or €1,500 per month per instance, depending on the category; for simple and medium measures the amount is at least the investment cost. For a mandatory investigation not carried out, the guide refers to a case-specific amount (10% of the energy bill). The competent authority sets the amount case by case; the table in the Enforcement section gives amounts and periods.

Free initial assessment

Do you know which of the three obligations applies to you?

In an exploratory call we go through your consumption over the past three years, establish whether you exceed 10 or 85 TJ, and determine which obligations and dates apply to your enterprise and sites. If you also want to use the same data for a flexibility scan or a grid congestion analysis, we can discuss that in the same call.

Discuss your situation →