Energy advice in the Netherlands costs from €2,500 (quick scan) to €100,000+ (strategic engagement), depending on the type of issue. For grid congestion and subsidy work, the Flex-e scheme covered up to 50% of the costs in 2026; its application window closed on 15 October. Below are market prices by scenario, the subsidies available and when advice pays for itself.

2026 market prices

Indicative rates by type of advice

Type of advice Lead time Market price (excl. VAT) Subsidy
Quick scan
Savings potential and contract check
1–2 weeks €2.500 - €5.000 —
Grid congestion flex scan
Flexibility, battery, ANW, on-site generation
4–8 weeks €5.000 - €10.000 50% via Flex-e (subsidy up to €10k; 2026 window closed)
Feasibility study
Full business case + technical design
2–4 months €10.000 - €30.000 50% via Flex-e (subsidy up to €125k; 2026 window closed)
EED energy audit
Mandatory above 10 TJ (EED): see the guide
4–12 weeks €3.500 - €15.000 —
SDE++ application
Including business case and choice of technology
2–4 months before the application window €5.000 - €15.000 No-win-no-fee possible
Tender support
EU procurement for energy or charging infrastructure
3–9 months €15.000 - €50.000 —
Strategic engagement
Multi-year advice + project management during delivery
6–18 months €25.000 - €100.000+ Per project phase

2026 market prices based on public FedEC rate overviews, reports from RVO (Netherlands Enterprise Agency) and industry publications. Actual costs vary by advisor, region and complexity.

Five factors that set the price

Why the range is so wide

1. Company size

Advice for an SME with one site costs a fraction of the same advice for a multi-site industrial cluster. Data volume, number of stakeholders and range of scenarios all scale with size.

2. Complexity of the grid connection

A standard small-consumer connection needs little analysis. A large-consumer connection (from 3x80 A) or an industrial medium-voltage connection with congestion issues needs in-depth analysis of grid operator data, contract types and flexibility options.

3. Number of scenarios and business cases

Modelling one option is cheaper than modelling five. Strategic engagements often compare on-site generation, battery storage, an ANW contract, a capacity restriction contract (CBC) and an energy hub, each with its own technical design, financing model and risk profile.

4. Subsidy stacking

Combining SDE++, EIA and MIA in one project takes more advisory time than a single scheme. It often pays for itself: a well-stacked subsidy package on a €2 million project yields €400,000–€800,000.

5. Support during delivery

Delivering an advisory report is cheap. Putting it into practice, by negotiating contracts, managing stakeholders and supervising technical delivery, is where the real value lies and where hourly rates (€110–€175/hour) add up.

2026 subsidies

Which schemes offset advisory fees?

Flex-e (RVO)

50% on advice · max. 40% on measures

For flexible electricity use on congested grids. Covers the flexibility scan (subsidy up to €10,000), feasibility study (€10,000–€125,000) and flexibility measures (€25,000–€300,000). The 2026 application window closed on 15 October.

Complete Flex-e guide →

Source: RVO Flex-e

EIA

40% investment allowance

Energy investment allowance for investments on the Energielijst (Energy List), such as heat pumps, insulation, LED lighting and batteries linked to your own renewable generation. Must be notified within 3 months of the order date. Threshold: €2,500.

Source: RVO EIA

MIA / Vamil

Up to 45% environmental investment allowance

Environmental investment allowance plus accelerated depreciation for assets on the Milieulijst (Environmental List). Cannot be combined with EIA on the same asset. Covers charging infrastructure, circular installations and green roofs, among others.

Source: RVO MIA/Vamil

SDE++

Operating subsidy, 12–15 years

For renewable energy generation and CO2 reduction: solar PV >15 kWp, heat pumps, geothermal, hydrogen, green gas. 2026 application round: 27 October to 26 November inclusive.

Source: RVO SDE++

DEI+

25–50% subsidy

Demonstratie Energie- en Klimaatinnovatie (energy and climate innovation demonstration scheme). For pilot and demonstration projects in CO2 reduction, energy storage, hydrogen and circular supply chains. Applications open theme by theme; check RVO for current rounds.

Source: RVO DEI+

EU Energy Communities Facility

€60,000 lump sum

EU subsidy for local energy communities (REC/CEC). For cooperatives, municipalities and partnerships that want to generate or share energy collectively.

Source: Energy Communities Facility

Three routes

DIY, installer or independent advisor?

DIY / in-house energy coordinator Installer or supplier Independent consultancy
Cost In-house staff cost (€60–€90/hour) Often free, or included in the installation price €110–€175/hour (billable)
Conflict of interest None, but limited knowledge Almost always (sales targets) None (independence statement)
Specialist knowledge Limited, typically 1–2 disciplines Deep in own product line, limited breadth Specialists in each field (grid congestion, subsidies, etc.)
Access to subsidies EIA/MIA possible, complex schemes difficult Sometimes via partner schemes Full: all relevant schemes
Suited to Basic savings, contract comparison, day-to-day management Standard installations with familiar technology Strategic and multi-disciplinary issues, grid congestion
Payback

When is energy advice worth it?

€10k - €100k+

Subsidy claims

A single SDE++ or EIA award on an investment project almost always returns 5 to 20 times the advisory fee.

5-15%

Contract optimisation

Restructuring energy contracts (dynamic, peak shaving, PPA) saves SMEs and large consumers 5–15% on the annual bill.

€100k+

Avoided second connection

A second grid connection costs €100,000–€500,000+ and takes 3–7 years. A good flexibility strategy often makes it unnecessary.

10-30%

Process optimisation

In industry and logistics, process optimisation (heat recovery, chiller tuning, demand response) cuts consumption by 10–30%.

Rule of thumb: from €100,000 in annual energy costs (~250,000 kWh or equivalent), independent advice almost always pays for itself within 1–3 years.

How we work

How Energyc approaches this

We give fixed-price indications for each phase. An exploratory call (30–60 min) comes with no obligation. You then receive a proposal setting out scope, lead time and outcome criteria. We work only for the client, never on commission from installers, suppliers or energy companies. That is laid down in our FedEC accreditation.

01

Initial assessment

Free initial meeting: we map the problem, define the scope and run a first subsidy scan. 30–60 minutes on site or online.

02

Proposal

Fixed price per phase, lead time, deliverables and who does what. No unexpected invoices.

03

Delivery

A specialist for each field. Weekly updates. Decision points along the way for scope choices.

04

Completion & follow-up

Report, presentation to stakeholders and, if you wish, support during delivery.

Frequently asked questions

Questions about costs and subsidies.

How much does energy advice cost in the Netherlands?

Energy advice in the Netherlands costs from €2,500 (quick scan) to €100,000+ (strategic engagement), depending on the type of issue. A quick scan costs €2,500–€5,000, a grid congestion flex scan €5,000–€10,000 (a 50% subsidy was available through Flex-e until 15 October 2026), a feasibility study €10,000–€30,000 and a strategic engagement €25,000–€100,000 or more.

What is a flex scan and what does it cost?

A flex scan maps how a company can use flexibility to resolve grid congestion, for example through battery storage, demand response, on-site generation or an ANW contract. The market price is between €5,000 and €10,000. Through the Flex-e scheme run by RVO (Netherlands Enterprise Agency), a 50% subsidy was available in 2026 for companies with a connection larger than 3x80 A; the 2026 application window closed on 15 October.

What subsidies are there for energy advice?

The main schemes in 2026 are: Flex-e (RVO) for flexibility scans, feasibility studies and flexibility measures, with a 50% subsidy on advice and up to 40% on measures (2026 application window closed on 15 October); EIA for energy-saving investments, a 40% investment allowance; MIA/Vamil for environmental investments, an environmental investment allowance of up to 45%; SDE++ for renewable energy generation; and DEI+ for demonstration projects.

What is the difference between an independent advisor and an installer who gives advice?

An independent advisor works without any financial interest in suppliers or installers. An installer who gives advice often has a commercial interest in specific products or brands. For strategic issues (grid congestion, energy procurement, subsidies), independence is essential, because sales targets could otherwise colour the advice.

How long does energy advice take?

A quick scan takes 1–2 weeks. A grid congestion flex scan takes 4–8 weeks. A feasibility study takes 2–4 months. A strategic engagement including support during delivery can take 6–18 months. Lead time depends mainly on data collection, stakeholder alignment and waiting times at the grid operator.

When does energy advice pay for itself?

For companies with substantial consumption (from about 250,000 kWh or an annual energy bill of €100,000), energy advice almost always pays for itself within 1–3 years. The biggest savings lie in contract optimisation (5–15% on the energy bill), subsidy claims (€10,000–€100,000+ per project), grid congestion strategy (avoiding a second connection costing €100,000+) and process optimisation (10–30% lower consumption).

What exactly is Flex-e?

Flex-e is an RVO subsidy scheme for flexible electricity use on congested grids. It covers 50% of a flexibility scan (subsidy up to €10,000), 50% of a feasibility study (€10,000–€125,000) and up to 40% of flexibility measures such as batteries and e-boilers (€25,000–€300,000). Flex-e applies to connections larger than 3x80 A. The 2026 application window ran from 6 May to 15 October inclusive and has closed.

How do I apply for an SDE++ subsidy and what does it cost?

An SDE++ application for heat pumps, solar PV, geothermal or hydrogen costs €5,000–€15,000 in advisory fees, depending on complexity. Many firms work on a no-win-no-fee basis (5–10% of the subsidy awarded). The 2026 application round runs from 27 October to 26 November inclusive; the exact dates shift each year (check RVO). Preparation (permits, business case, grid connection) must start at least 6 months ahead.

What does support for an EU energy tender cost?

Tender support for energy installations or charging infrastructure costs €15,000–€50,000, depending on project size and the complexity of the specifications. Above the EU thresholds (about €216,000 for services, about €5.4 million for works), specialist support is well worth having: mistakes lead to 3–12 months' delay or legal challenges.

What documents do I need for energy advice?

For effective energy advice you need: current energy contracts (electricity, gas), invoices for the past 12–24 months, quarterly readings from smart meters, floor plans or installation diagrams, any earlier audits (EED, ISO 50001) and, for grid congestion questions, your current connection terms with the grid operator.

Is an EED energy audit mandatory?

That depends on your energy consumption and on the Dutch transposition. The revised EU Energy Efficiency Directive places the audit obligation on companies with average annual consumption above 10 TJ, with a new audit every four years; above 85 TJ an energy management system replaces the audit, with 11 October 2027 as the date set in the directive. Dutch law still refers to 'large enterprises': the bill introducing the TJ thresholds was before the Senate (Eerste Kamer) on 22 September 2026. At Energyc an EED audit typically costs €3,500 to €15,000; the explanatory note to the draft decree estimates €2,000 to €30,000. More in our guide to the EED audit obligation.

Can I manage without an energy advisor?

For simple matters (comparing energy contracts, basic savings), an in-house energy coordinator can do a lot. For strategic issues such as grid congestion, subsidy stacking, energy hubs, ANW connections and battery business cases, specialist advice is almost always more cost-effective, because one missed subsidy or wrong contract choice can easily cost €50,000–€500,000.

What is an ANW connection?

An ANW connection is a type of grid connection available only in regions with grid congestion. With an ANW contract a company gets capacity straight away, but accepts limited availability at peak times. The grid operator can curtail demand during congestion. A good ANW route requires both contract negotiation and flexibility management on site.

Does Energyc work nationally or only in Friesland?

Energyc works nationally. Our office is in Drachten (Friesland), but the team advises clients across the Netherlands, from Groningen to Tilburg and Apeldoorn to Amsterdam. We work for commercial companies, municipalities and provinces, and are FedEC-accredited. Specific focus areas: the northern Netherlands (Friesland, Groningen, Drenthe), Overijssel/Gelderland and the Randstad.

Sources & references

Sources

Exploratory call

Want to know what advice would cost in your situation?

A 30–60 minute conversation comes with no obligation. We map out the issue, run a first subsidy scan and give you a specific price indication. No time pressure, no sales pitch.

Discuss your situation →