EU procurement. Buying energy services without compromise.

For public organisations that must put complex energy services out to EU tender (above the EU thresholds), from market sounding to award. In line with the Public Procurement Act (Aanbestedingswet), with a focus on quality and sustainability.

20+Tenders supported
€80M+Contract value
BVP & MEATMethods
Sound familiar?
  • Your energy procurement or charging infrastructure is above the EU threshold, so it must go to EU tender.
  • Open or restricted, MEAT or BVP: which procedure fits your scope?
  • The award must withstand challenge and the scrutiny of the audit office (rekenkamer).

With an invitation to tender that gets the market thinking, you end up with the supplier best able to do the work rather than the cheapest, and an award that stands up to challenge or audit. Read about the options, how they have worked in practice and who you would speak to.

Our services

Five practical approaches.

There is no standard solution. We choose the combination that delivers most in each situation.

Market sounding

Who offers what, and in what form? We map suppliers, gather references and determine which form of tender suits the market.

Procurement strategy

Open / restricted, MEAT / lowest price, BVP / standard. We advise on which form gives the best outcome for your scope.

Guide: grid congestion for municipalities →

Tender documents

Selection and award documents, MEAT criteria, evaluation matrix. In line with TenderNed standards.

Evaluation & award

Organising the evaluation panel, conducting interviews, recording scores and justifying the award decision, so that it withstands challenge.

Case study: BAT Tilburg tender on MEAT criteria →

Contract management

After award: contract management, KPI monitoring, evaluation. For long-term contracts (energy supply, charging infrastructure maintenance).

Energy markets & procurement →

When does a contract have to go to EU tender?

EU procurement is mandatory for public organisations on contracts above the EU thresholds: €216,000 for supplies and services and €5,404,000 for works (sub-central authorities, 2026–2027 thresholds). The procedure runs through TenderNed, the Dutch procurement platform, and must meet strict transparency requirements.

BAT Tilburg site: EU procurement for the largest DC charging hub for heavy goods vehicles in the Netherlands. The problem
What's happening

Energy tenders call for specialists.

Energy procurement, charging infrastructure, battery systems, PPAs: these are complex services with fast-changing technology and regulation. Standard tender wording delivers standard outcomes.

We design tenders that attract what you need: the supplier best able to do the work, rather than the cheapest. That means MEAT criteria that matter (TCO, flexibility, sustainability) as well as price.

For public bodies: fully compliant with the Public Procurement Act 2012 (Aanbestedingswet 2012), with market consultation where useful, BVP (Best Value Procurement) where appropriate, and a transparent process that stands up to the scrutiny of an audit office or internal audit service.

Aerial view of the Vrijburgh new-build neighbourhood in Drachten: national grid-aware new build pilot with VRO and Liander Case study
In practice

Netbewuste Nieuwbouw: tender with VRO & Liander.

Energyc supported the tender for an alternative energy architecture for new build on congested grids. A pilot for the Ministry of Housing and Spatial Planning (VRO) and grid operator Liander.

National pilotVRO & Liander
TenderFully supported
Market consultationUpfront
Read the Netbewuste Nieuwbouw case study
Far from a formality, a good tender is a targeted invitation that draws ideas out of the market and ultimately gives you a better solution. Energyc · Our approach to procurement
01

How long does a procurement process take?

Market consultation and drafting the tender documents: 6–10 weeks. Tender procedure (above the EU threshold): 12–16 weeks from publication. Award and standstill period: 4–6 weeks.

02

Do you also offer BVP?

Yes. For projects where the scope of supply is unclear and innovation is required, Best Value Procurement often works better than a conventional MEAT procedure. We facilitate the whole process.

03

What does it cost?

Scoping and strategy €5,000 to €12,000; full procurement support €15,000 to €50,000, depending on complexity and the number of lots.

Driver charging an electric truck at the BAT Tilburg charging hub
Frequently asked questions

Answers to your first questions.

When is EU procurement mandatory?

EU procurement is mandatory for public organisations once the estimated contract value exceeds the EU thresholds: €216,000 for supplies and services and €5,404,000 for works (sub-central authorities, 2026–2027 thresholds). The procedure runs through TenderNed, the Dutch procurement platform, and must comply with the Public Procurement Act 2012 (Aanbestedingswet 2012), including strict transparency requirements.

How long does an EU tender take?

Allow roughly six months. Market consultation and drafting the tender documents take 6–10 weeks, the procedure above the EU threshold takes 12–16 weeks from publication, and award plus the standstill period take another 4–6 weeks.

What is a MEAT (EMVI) award?

EMVI stands for Economisch Meest Voordelige Inschrijving, the most economically advantageous tender (MEAT): you award on the best balance of price and quality rather than on the lowest price. Criteria such as total cost of ownership (TCO), flexibility and sustainability are weighted in an evaluation matrix published in advance. For complex energy services this almost always leads to a better outcome than awarding on price alone.

What is Best Value Procurement (BVP)?

Best Value Procurement (prestatie-inkoop) is a procurement method that treats the bidder as the expert, who shows how they would best carry out the contract. BVP works especially well when the scope of supply is still unclear and you want innovation from the market. Energyc facilitates the full BVP process, from invitation to tender through interviews to award.

What does procurement support cost?

Full procurement support costs €15,000 to €50,000, depending on complexity and the number of lots; a standalone scoping or strategy phase is agreed in advance for a fixed fee. The Flex-e application window run by RVO (the Netherlands Enterprise Agency), which offered a 50% subsidy on a flexibility scan or feasibility study for grid congestion, was open in 2026 until 15 October inclusive; see our Flex-e guide for more.

Tender coming up?

Schedule an exploratory call about your tender.

You share the scope, schedule and organisational context. We come back with advice on the form of tender and the most promising MEAT criteria.

Discuss your situation →