Flexibility scan: what it is, what it costs and what it delivers
Are you in the queue for more capacity, or have you been told the grid is congested? Then the flexibility scan is almost always the first step. The scan shows how much room there is in your own operations, and in 2026 RVO (Netherlands Enterprise Agency) reimbursed 50% of it through Flex-e, up to €10,000. The 2026 application window closed at 17:00 on 15 October 2026.
What is a flexibility scan?
A flexibility scan maps how much room there is in your operations to use electricity at different times. The scan sets your quarter-hourly consumption over a representative year against the congestion situation in your area and identifies specific measures, each with its investment cost and payback period. RVO's Flex-e scheme reimbursed 50% of the cost in 2026, up to €10,000 in subsidy; applications closed at 17:00 on 15 October 2026.
What a flexibility scan should contain
RVO prescribes which components the scan must contain, and for good reason: together they give you exactly the information you need for a conversation with your grid operator that gets somewhere.
| Component | What it contains | Why it matters |
|---|---|---|
| Area overview | The grid operators' capacity map and the latest congestion report for your congestion area. | Determines which kinds of flexibility have value in your area: offtake, feed-in or both. |
| Process description | The main processes in your business, plus any on-site generation or conversion and its capacity. | Without a view of what runs and when, every measure is a gamble. |
| Consumption profile | Quarter-hourly electricity consumption by year, month, week and day, taken from a representative year out of the last three. Gas, heat and other energy carriers where applicable. | This is the hard data everything rests on. You cannot reduce peaks you do not measure. |
| Peak analysis | An explanation of the peaks and troughs in your consumption: which process causes what, and when. | This is almost always where the gains are: one or two processes determine the kWmax. |
| Measures with figures | The investment cost and an estimated payback period for each measure. | Lets the board, not just the engineers, discuss the choice. |
| Conclusion | Pros and cons of your preferred measures, with a conclusion on the most promising one. | One recommendation, backed by evidence, is what separates a scan from a brochure. |
Source: RVO, Flex-e: Flexibiliteitsscan (accessed 22 September 2026).
Scan, study, measures: in that order
Flex-e had three application windows, one for each step in the sequence. RVO always advises starting with the scan: it is the cheapest and quickest step, and it determines whether the rest makes sense.
| Component | What it delivers | Reimbursement |
|---|---|---|
| Flexibility scan | A view of what is possible in your operations, with a recommendation. | 50%: subsidy up to €10,000 |
| Feasibility study | The promising measures worked up in technical and financial detail, including whether congestion management is possible. | 50%: subsidy of €10,000 to €125,000 |
| Flexibility measures | The implementation itself: battery, e-boiler, heat pump with heat buffer, cold or heat buffer. | Max. 40%: subsidy of €25,000 to €300,000 |
All three application windows closed at 17:00 on 15 October 2026. The full conditions for each part are in our Flex-e guide; if your question goes beyond subsidy, see solving grid congestion.
Independence is the whole point here
A flexibility scan is advice about investments: a battery, an e-boiler, a different contract. Anyone who writes that advice and may also supply the installation has a stake in the outcome. Energyc has no commercial ties with installers or suppliers and receives no commissions: we make our money from the advice, not from what you buy afterwards.
We are FedEC-accredited and carry out Flex-e projects for industry, transport, agricultural businesses and business parks across the Netherlands. The case studies show the results: at Metalis, the combination of a battery, solar and a capacity restriction contract made the expansion possible after all; at Raben, the DC charging hub was operational within six months, against a standard wait of more than five years.
An initial assessment is free; you then receive a quote with a fixed price, scope and deliverables.
Questions about the flexibility scan.
What is a flexibility scan?
A flexibility scan maps how much room there is in your own operations to use electricity at different times. The scan combines your quarter-hourly consumption over a representative year with the congestion situation in your area and sets out specific measures, each with its investment cost and expected payback period. The result is an evidence-based answer to whether you can grow within your existing connection and, if not, which route will work.
What does a flexibility scan cost and what did Flex-e reimburse?
In 2026, the Flex-e scheme run by RVO (Netherlands Enterprise Agency) reimbursed 50% of the cost of a flexibility scan, with a maximum subsidy of €10,000 (the 2026 application window closed at 17:00 on 15 October 2026). At Energyc, a flexibility scan typically costs between €5,000 and €10,000, depending on the complexity of your process and the number of connections. 2026 applicants receive the full subsidy amount as an advance; RVO may ask to see the scan afterwards as a spot check.
What was the deadline for applying for Flex-e?
The 2026 application window ran from 09:00 on 6 May 2026 to 17:00 on 15 October 2026. Applicants logged in with at least eHerkenning level 2+. Important: the application had to be submitted before the advisory work started; starting earlier forfeited the right to the subsidy. RVO decides within 8 weeks of a complete application and can extend that period by 8 weeks.
Who was eligible in 2026?
In 2026, any organisation with a large-consumer connection (above 3x80 A, with a contract with a metering company) could apply (window closed at 17:00 on 15 October 2026). That widened eligibility compared with earlier rounds: the lower limit of 100 kW of contracted transport capacity (GTV) was dropped, and tenants without their own connection and transport agreement could also take part. The scheme applied both inside and outside congestion areas.
Does the scan have to be done by a recognised or accredited advisor?
No. RVO requires no accreditation and you choose your own energy advisor. RVO does refer to the Netcongestie Register for a list of qualified advisors. What matters in practice is independence: an advisor who takes no commission from installers or suppliers has no stake in the outcome. Energyc is FedEC-accredited, works without commissions and carries out Flex-e projects.
What is the difference between the scan, the feasibility study and the measures?
Flex-e had three parts, in sequence. The flexibility scan explores what is possible: 50% reimbursement, up to €10,000 in subsidy. The feasibility study works up the promising measures in technical and financial detail: 50% reimbursement, subsidy of €10,000 to €125,000. The flexibility measures themselves (battery, e-boiler, heat pump with buffer) fell under the third part: up to 40%, subsidy of €25,000 to €300,000. RVO always advises starting with the scan.
Sources
- RVO — Flex-e: Flexibiliteitsscan · 50% reimbursement up to €10,000, mandatory components, application period (accessed 22 September 2026)
- RVO — Flex-e: Haalbaarheidsstudie · subsidy of €10,000–€125,000, changes in 2026, advance payment scheme (accessed 22 September 2026)
- RVO — Subsidie flexibel elektriciteitsverbruik (Flex-e) · application window 6 May to 15 October 2026 (accessed 22 September 2026)
- Netcongestie Register · list of qualified advisors that RVO refers to
- Netbeheer Nederland — Capaciteitskaart · current congestion status by area
Want to know whether a flexibility scan would pay off for you?
In a 30–60 minute conversation we look at your connection, your consumption profile and the congestion situation in your area. After that, you will know whether a scan makes sense.
Discuss your situation →