Grid congestion. The grid is at capacity. We help you find a way forward.
Grid congestion and transport restrictions are the biggest bottleneck in the energy transition. We break the deadlock with strategic solutions such as energy hubs, cable pooling, battery storage and collective flexibility. As a Congestion Service Provider (CSP) we can also offer your flexibility to the grid operator ourselves, with no intermediary.
- Connection refused, or years in the queue at Liander.
- No transport capacity: your site is red on the capacity map.
- You want to electrify or expand, but you can't get a bigger connection.
Even without grid reinforcement there is often still room: sharing a connection with neighbouring businesses, a battery behind the meter, or a contract under which you reduce demand when the grid is busy. Read about the options, how they have worked in practice and who you would speak to.
Our services
Five strategies for grid congestion.
There is no standard solution. We choose the combination that delivers most in each situation, often a mix of two or three of the approaches below.
Energy hubs
Shared infrastructure: several businesses on one connection, often combined with generation and storage. We develop the business model, set up the governance and guide delivery.
Guide: energy hub & GTO →Cable pooling
Sharing one connection between complementary profiles (e.g. solar & wind, or solar & EV charging). We model how they overlap and put the joint contracts in place with the grid operator.
Guide: solar panels without feed-in →Battery storage
Batteries behind the meter that cut peak demand, avoid congestion and take part in the balancing market. We work out the business case and draw up the control strategy.
Guide: business battery →ANW & CBC-T contracts
ANW contracts and capacity restriction contracts (CBC-T) make a connection possible in congestion areas. We negotiate the contract type that suits your operations.
Guide: upgrade or flexible contract →Monetising flexibility
Turn your flexibility into revenue through GOPACS, dynamic tariffs or bilateral contracts with grid operators and aggregators. We identify the potential and put the right contracts in place.
Not sure which route fits? Read the complete guide →
Further reading: Peak demand and contracted capacity · Solar panels without feed-in · Applying for or upgrading a connection · Grid congestion for municipalities · Business battery
What is grid congestion?
Grid congestion means the Dutch electricity grid lacks the capacity to meet growing demand. In Friesland, Groningen and Drenthe especially, there is no room for new connections, and there won't be for years. Companies wanting to expand and municipalities developing business parks get stuck in grid operators' queues.
The problem
Queues, stagnation, uncertainty.
In the northern Netherlands especially, the grid is congested: if you want to expand or connect, you join a queue.
Companies looking to expand, municipalities trying to bring business parks to market and developers wanting to build all run up against grid congestion. In congestion areas the wait can reach 10 years (how the queue works).
Expanding the grid alone is not a solution: a new substation takes 7 to 10 years. If you want to act now, you have to use the available capacity more intelligently. TenneT and ACM (the Dutch regulator) encourage innovative approaches that ease congestion without major infrastructure investment.
Case study
Metalis: from 0 kW to 0 tonnes of CO2.
Metalis could not get any capacity from Liander. Energyc built an integrated system: 450 solar panels, a 1.2 MWh battery and a CBC-T contract. The result: room to grow, gas-free operation and CO2 down from 67 to 0 tonnes.
Grid congestion in numbers
Waiting time for a grid connection
For large-consumer connections in the northern Netherlands the wait can reach ten years. New substations are not coming fast enough to keep up with growing demand.
Energyc projects with a grid congestion solution
We have now supported more than thirty projects in which congestion was the central bottleneck. Six of them are completed energy hubs with several businesses behind one connection.
What you can expect
You don't solve grid congestion with a single technology. We put together packages (battery, cable pooling, ANW, energy hub) that between them deliver the connection you need. Energyc · Our approach to grid congestion
How long does a project take?
Scoping and advice: 4–8 weeks. Delivering a battery or cable-pooling scheme: 6–18 months, depending on permits and lead times. An energy hub: 1–3 years including governance.
Who do you work for?
Industry, logistics, municipalities, provinces and developers. From a single company with a stalled connection request to area-wide projects in which several businesses share one connection.
What does it cost?
Initial scoping is free. Analysis and design from €4,500; more complex projects with implementation support €15,000 to €40,000, by the hour or at a fixed price. It nearly always pays for itself in the first year of operation.
Free congestion check
Know where you stand on the grid.
Give us your postcode and connection size. Within 2 working days we will send you the status of your location on the capacity map and a first assessment of the options, free of charge and with no obligation.
Answers to your first questions.
How do I know if my site is in a congestion area?
Liander and TenneT publish capacity maps, updated monthly, with red (full), orange (limited) and green (available) zones. For your exact location we can show you the current status and the forecast for the next 5 years, often in a single phone call.
What does a grid congestion project with Energyc cost?
Initial scoping is free. A full analysis and design starts from €4,500. More complex projects with implementation support (energy hub, battery plus cable pooling) cost between €15,000 and €40,000. We work by the hour or at a fixed price, always agreed in advance. The Flex-e application window run by RVO (the Netherlands Enterprise Agency), which offered a 50% subsidy on a flexibility scan or feasibility study, was open in 2026 until 15 October inclusive; see our Flex-e guide for more. RVO does not require accreditation; Energyc is FedEC-accredited. See our complete cost guide.
How quickly can we get a grid connection with your approach?
With an ANW or capacity restriction (CBC-T) contract, a temporary connection is often possible within 3–6 months. A battery storage system takes 6–12 months from design to commissioning. An energy hub with several businesses takes 1–3 years including governance. Compare that with a wait that can reach 10 years in congestion areas.
Will you work with our installer?
Yes. We are an independent advisor, not an installer. We often handle engineering, contract management and tender support, while your installer takes on delivery. The handover is clear and set down in the contract. That works for both commercial and public clients.
Which subsidies can we stack for a grid congestion solution?
EIA may be possible for battery storage; SDE++ is often the route for PV; provincial schemes are available for energy hubs; AanZET covers electric trucks and SPRILA covers charging infrastructure. We check which combinations the rules allow and which application should logically go first.
What if grid congestion still stops our project?
This is exactly what our approach is for: rather than wait for grid reinforcement, we design intelligently around the capacity available today. Our Metalis case study (Drachten) shows how a company with 0 kW of available capacity still became fully operational through an integrated system. More than 30 comparable projects have delivered results this way.