Practical guide, updated October 2026

Applying for a SPRILA subsidy: charging infrastructure and batteries

SPRILA covers the charge points and the battery on your own site with fixed amounts per charging station. The 2026 window is open up to and including 18 December, but RVO (the Netherlands Enterprise Agency) processes applications in order of receipt and the budget is visibly running down. Below we set out exactly what the scheme covers, which pot covers which part of a charging hub (SPRILA, AanZET or Flex-e) and where applications come unstuck in practice.

What is the SPRILA scheme?

SPRILA stands for Subsidieregeling Private Laadinfrastructuur bij bedrijven, the subsidy scheme for private charging infrastructure at businesses. It covers the installation of charging infrastructure on owned or leased sites with fixed amounts per charging station, ranging from €400 for an AC charging station of 11 kW or more to €88,000 for a DC charging station of 550 kW or more, plus €60 to €85 per kWh for a stationary battery up to 1,000 kWh. The total budget for 2026 is €122.5 million; the window is open from 20 January up to and including 18 December 2026 and runs on a first-come, first-served basis.

Who it is for & how much

What exactly does SPRILA cover?

SPRILA is for businesses installing charging infrastructure on owned or leased sites: a haulier with a depot, a manufacturer with vans, a property owner with tenants who want to charge. Unlike Flex-e, SPRILA pays fixed amounts per charging station rather than a percentage of costs. That makes the subsidy easy to calculate in advance, and it means the choice of charging station type matters financially.

18 December2026 window closes at 12:00
€122.5mTotal budget 2026
€2,500Minimum subsidy per location

Across the board, SMEs get double what a large company receives. State aid limits apply on top: a large company may receive at most 20% of project costs in aid, an SME at most 40%. If the fixed amounts add up to more than that, RVO reduces the subsidy. An SME declaration is therefore no formality: it determines half of your subsidy.

Charging station type Large company SME
AC from 11 kW
1 charge point
€400€800
AC from 2×11 kW
dual unit, 2 charge points
€800€1.600
AC from 43 kW
1 charge point
€880€1.760
AC from 2×43 kW
dual unit, 2 charge points
€1.760€3.520
DC from 20 kW€1.950€3.900
DC from 50 kW€4.880€9.760
DC from 100 kW€8.850€17.700
DC from 150 kW€12.200€24.400
DC from 220 kW€15.500€31.000
DC from 350 kW€26.250€52.500
DC from 550 kW€44.000€88.000
Stationary battery
up to 1,000 kWh per charging bay
€60 per kWh€85 per kWh

Amounts as stated in RVO's list of subsidy amounts for 2026 (page checked 25 August 2026). For a DC charging station, the total output of the station counts, not that of a single charge point. For public transport concession holders, the 1,000 kWh battery maximum does not apply.

Stacking

Which pot covers which part of your charging hub?

This is where most time is lost. A haulier going electric deals with three schemes that each cover a different piece of the same project. They are separate from one another, with different application windows and different deadlines, and this autumn those deadlines fell close together.

Scheme Covers 2026 window Budget
AanZET
Purchase subsidy for zero-emission trucks
The zero-emission truck itself (N3, or N2 from 10,000 kg). 6.1% to 29% of the chassis price, up to €115,200 29 September – 16 October 2026 €119.2m
SPRILA
this page
Charge points and stationary battery on your own site, fixed amounts per charging station 20 January – 18 December 2026 €122.5m
Flex-e
flexible electricity use
Flexibility scan and feasibility study (50%) and flexibility measures for grid congestion (max. 40%) 6 May – 15 October 2026 See RVO

Two things to be clear about. First, double funding of the same cost item is ruled out under almost every scheme. A battery can fall under SPRILA and also under Flex-e as a flexibility measure, so choose in advance which route is most favourable financially, rather than applying for both and finding out at final settlement. Second, the 2026 Flex-e window closed on 15 October and the budget for AanZET round 2 was oversubscribed on 1 October; SPRILA stays open up to and including 18 December 2026.

If you are up against a congested grid, with no extra capacity available or none for years, charging infrastructure is not your first problem. RVO warns about this explicitly for both SPRILA and AanZET. In that case, start with the grid connection: see the guide to all the routes for dealing with grid congestion and the explanation of energy hubs and the group transport agreement.

Step by step

The application in five steps

RVO estimates 2.5 to 3 hours for a complete application. The threshold that decides everything is €25,000 in subsidy. Below it, the application is simpler and the amount is settled and paid in one go. Above it, you also need a capacity calculation and a contract with the grid operator, and you receive 50% as an advance.

01

Establish your charging needs

How many vehicles, which driving profiles, how many kWh per night? This determines the type and number of charging stations, and so directly the subsidy amount, because SPRILA pays per station and per power category.

02

Work out which side of €25,000 you fall on

RVO has a calculation tool for this. Below €25,000 the route is shorter; from €25,000 a capacity calculation is required and payment comes in two instalments. Also check that you reach the minimum of €2,500 per location.

03

Gather the supporting documents

Quotation or invoice, charging station specifications and, for larger applications, the contract with the grid operator. If you are an SME, include the SME declaration. It doubles your subsidy, so do not forget it.

04

Submit and keep an eye on the queue

Applications are processed in order of date of receipt. RVO aims for a decision within 6 weeks; the statutory period is 13 weeks. The current budget per activity is on the RVO page.

05

Install and apply for final settlement

For a subsidy of €25,000 or more, you submit your final settlement request within 24 months of the advance. If force majeure prevents this, you can request an extension once, for up to 12 months.

Pitfalls

Five mistakes that make SPRILA applications costly

1. Forgetting the SME declaration

The difference between a large company and an SME is exactly a factor of two: €12,200 or €24,400 for a DC charging station from 150 kW. Without a declaration, RVO applies the lower rate. Under AanZET, an SME declaration sent with the application also gives priority in the assessment.

2. Making the charging hub publicly accessible

SPRILA is for private charging infrastructure. For 24 months after final settlement, your stations may be listed in the register as 'restricted access' at most, not as 'publicly accessible'. If you later decide to open the hub to third parties, you lose the subsidy. SPULA covers public charging infrastructure for heavy transport.

3. Underestimating the 70% battery requirement

At least 70% of the kWh coming out of the stationary battery must demonstrably go to the charging stations. A battery that mainly does peak shaving for the factory does not meet this. RVO can request three consecutive months of usage data from the battery management system and your charging session records.

4. Waiting until the autumn

The window does not close until 18 December, but processing is in order of receipt. By 24 August 2026, applications already totalled €49.1 million of the €68.5 million charging infrastructure budget and €29.6 million of the €45 million battery budget. There is still room, but it is shrinking.

5. Securing the subsidy before talking to the grid operator

An approved SPRILA application does not deliver a single extra kilowatt. In congested areas it is the grid connection that determines what is possible, not the budget. So first ask how much capacity you will actually get and when, and only then which subsidy fits.

Why Energyc

We do not sell charge points

Energyc is FedEC-accredited and works only for the client, never on commission from installers, charge point suppliers or energy companies. For charging infrastructure this matters: the number and type of charging stations determine both your investment and your subsidy, and the party supplying the units has a vested interest in that.

You can see what that delivers in our case studies: at Raben Group, a charging hub with four 400 kW DC chargers and a 200 kWh battery, made possible by an ANW contract; at BAT in Tilburg, thirty 400 kW chargers whose total demand stays below 600 kVA thanks to smart charging, well within the 800 kVA grid connection. Read more about the approach on the e-mobility transition page; our rates are in the energy advice cost guide.

Frequently asked questions

Questions about SPRILA.

How much subsidy does SPRILA pay?

SPRILA works with fixed amounts per charging station, not a percentage. An AC charging station of 11 kW or more attracts a subsidy of €400 for a large company and €800 for an SME; a DC charging station of 150 kW or more attracts €12,200 and €24,400 respectively, and one of 550 kW or more €44,000 and €88,000. For a stationary battery the rate is €60 per kWh for a large company and €85 per kWh for an SME, up to 1,000 kWh per charging bay. State aid limits apply on top of this: at most 20% of project costs for large companies and 40% for SMEs.

When can I apply for SPRILA, and is there any rush?

The 2026 application window runs from 09:00 on 20 January until 12:00 on Friday 18 December 2026. RVO (the Netherlands Enterprise Agency) processes applications in order of date of receipt, so once the budget is gone, it is gone. By 24 August 2026, applications already totalled €49.1 million of the €68.5 million charging infrastructure budget and €29.6 million of the €45 million battery budget. Waiting until December is therefore a gamble.

What is the difference between SPRILA, AanZET and Flex-e?

They cover different parts of the same project. AanZET covers the purchase of the zero-emission truck itself (the autumn round ran from 29 September up to and including 16 October 2026, budget €119.2 million, oversubscribed on 1 October). SPRILA covers the charge points and a stationary battery on your own site. Flex-e covers the advice (flexibility scan and feasibility study) and flexibility measures for grid congestion (the 2026 window closed on 15 October). Double funding of the same cost item is ruled out under almost every scheme, so have someone work out in advance which pot covers which part.

What requirements apply to the battery?

The subsidy for a battery combined with newly installed charging infrastructure is at least €25,000. The C-rate of the hardware must not exceed 0.5, except for an integrated battery or an application from a public transport concession holder. After installation you register the battery on Energieleveren or with your grid operator, and the battery must remain your property for at least 24 months after final settlement. Note that at least 70% of the kWh you discharge from the battery must demonstrably go to the charging stations. RVO can request three consecutive months of usage data.

Who is not eligible for SPRILA?

Government bodies cannot apply for SPRILA: provinces, municipalities, water boards, independent administrative bodies (ZBOs) and other public bodies. Nor can businesses that intend to operate the charging infrastructure. And the charging infrastructure must stay private: for at least 24 months after final settlement, your charging stations may be listed in the public charging infrastructure register as 'restricted access' at most, not as 'publicly accessible'.

Sources & references

Sources

Free initial assessment

Which pot covers your charging hub?

In a 30–60 minute conversation, we look at your charging needs, your grid connection and the three schemes together. No obligation, no sales pitch. If it makes sense, we help with the application.