Subsidies. Which pot fits, and how to win it.

SDE++, EIA, ISDE, MIA/Vamil, provincial funds: every scheme has its own criteria, deadlines and application procedures. We know which scheme fits, and how to make your application hold up, even in oversubscribed rounds.

€15M+Awarded to clients
80+Applications submitted
5Active subsidy programmes
Sound familiar?
  • You don't know which scheme fits your project.
  • The application round closed before your paperwork was ready.
  • You want to stack EIA and SDE++, but the cumulation rules are unclear.
  • RVO has rejected your application.

There is often still a way forward: a scheme that does fit, a later round you are ready for, or an objection to RVO within six weeks. Read about the options, how they have worked in practice and who you would speak to.

Our services

Five practical approaches.

There is no standard solution. We choose the combination that delivers most in each situation.

SDE++

For renewable energy production and CO2 reduction projects. We screen the project, structure the application and handle the annual reporting.

SDE++ and the transport capacity indication →

EIA & MIA/Vamil

Investment allowance for energy-efficient assets. We check the Energy and Environment Lists and file the notification with RVO.

EIA for a business battery →

ISDE & AanZET

ISDE for heat pumps and insulation (households and businesses), AanZET for new zero-emission trucks. We time the application to the opening of the round. AanZET round 2 of 2026 (29 September to 16 October inclusive) was already oversubscribed on 1 October.

Guide: AanZET →

Provincial & municipal schemes

Friesland, Drenthe, Groningen, Overijssel: each province has its own funds for sustainability, mobility and entrepreneurship. We screen what fits.

European funds

EU Innovation Fund, Horizon Europe, JTF, ERDF (EFRO). For scalable innovation projects with cross-border impact.

Charging infrastructure or a battery? Read the SPRILA guide →

What energy subsidies are available in 2026?

The main Dutch energy subsidies in 2026 are SDE++ (renewable energy production), EIA (Energy Investment Allowance), ISDE (Sustainable Energy and Energy Saving Investment Subsidy), MIA/Vamil (environmentally friendly business assets) and AanZET for zero-emission trucks. Provinces have additional regional schemes.

KNVB Campus Zeist: sustainability project with SDE++ and EIA subsidies, supported by Energyc. The problem
What's happening

Lots of pots. Lots of competition. Lots of small print.

SDE++ is heavily oversubscribed every year: only the strongest business cases get an award. EIA and ISDE change scope every year. Provincial schemes differ between Drenthe, Friesland and Groningen.

We track when rounds open, know the assessment criteria used by RVO and the provinces, and know which subsidy combinations can be stacked under the cumulation rules.

More importantly, we build the application to score. Strong supporting evidence, a realistic schedule, the right phasing. And if it doesn't fit, honest advice so you don't waste time.

NVO Transport: electric trucks and charging infrastructure for the cooperative EV transition of 54 logistics companies Case study
In practice

NVO Transport: AanZET secured.

NVO Transport (a cooperative of 54 transport companies) is moving to electric transport. Energyc handled the AanZET application and is planning the implementation.

AanZETApplication granted
54 companiesCooperative programme
EV transitionIn progress
Read the NVO case study
A good subsidy application starts with one question: does this project fit this scheme? Often the answer is no, and then we look for the pot that does. Energyc · Our approach to subsidies
01

What is the success rate?

70–85% for rigorously screened projects. 0% for projects outside the scope, and we tell you that upfront, not afterwards. In oversubscribed rounds, every detail of the supporting evidence counts.

02

How do you charge for your work?

A fixed fee for screening and application. We do not work on a no-win-no-fee basis (it creates the wrong incentives). Optionally, a success fee on a small part of the award. All clearly itemised.

03

Do you also handle the final settlement?

Yes. SDE++ annual reporting, EIA notification to RVO, ISDE final settlement. We handle the administration from start to finish.

Aerial photo of the IBF Heerenveen business park
Frequently asked questions

Answers to your subsidy questions.

Can I combine EIA and SDE++ in one project?

Often, yes. The cumulation rules decide which combinations are allowed: not every scheme can be stacked on the same asset. At Metalis in Drachten, SDE++ and EIA were stacked within one project. We check upfront which combinations the rules permit and the best order for the applications.

When does the 2026 SDE++ round open?

SDE++ has one application round a year; the 2026 round runs from 27 October to 26 November 2026 inclusive. Start preparing (permits, business case, grid connection) at least six months before it opens. The scheme is heavily oversubscribed every year, so only tightly argued business cases win an award.

What does support with a subsidy application cost?

Market rates for advisory support on an SDE++ application are between €5,000 and €15,000, depending on complexity. We charge a fixed fee agreed in advance for screening plus application, optionally with a success fee on a small part of the award. The Flex-e application window run by RVO (the Netherlands Enterprise Agency), which offered a 50% subsidy towards a flexibility scan or feasibility study where grid congestion is a problem, closed on 15 October 2026. See our complete Flex-e guide →

What happens if my subsidy application is rejected?

You can lodge an objection with RVO within six weeks, or refine the project and reapply in a later round. We mainly limit that risk upfront: rigorously screened projects have a 70–85% success rate, and if a project falls outside a scheme's scope, we tell you honestly before you apply, not after.

Which subsidies are available for battery storage?

Larger battery systems (above 50 kWh) are on the EIA Energy List, which lets you deduct part of the investment for tax purposes; the notification must be filed with RVO within three months of entering into the commitment. Flex-e (50% towards advice, up to 40% towards flexibility measures such as a battery) had a 2026 application window, which closed on 15 October. Provinces such as Friesland, Drenthe and Groningen also have their own schemes; we screen what fits each location.

Is there a subsidy for research into an energy hub?

Yes. RVO's Energy Hub Research scheme (Onderzoek Energiehubs, EHUB) is open from 09:00 on 1 October 2026 until 17:00 on 1 May 2027. A scan qualifies for €5,000 or €8,500, depending on the number of participants; a study of a new hub receives 70% of eligible costs, with a minimum of €25,000 and a maximum of €42,000. At least three unrelated businesses, each with a connection above 3x80 A, must take part. See our EHUB guide →

Project in the pipeline?

We'll check which subsidies fit, free of charge.

You share the project size, technology and schedule. We come back with the subsidy route and the chance of success, and we are honest even if it is low.

Discuss your situation →